Vermilion Energy

For the second largest onshore oil & gas supplier Vermilion Energy The Netherlands we received the esteemed order for the overhaul and rebuilt of a Wellhead Control Panel using the materials out of two existing Wellhead Control Panels. Next to a complete new line-up of components, tubing and wiring, an additional choke valve operation section has been created inside the cabinet. Delivery time including pressure-, leak-, and function testing was achieved within ten weeks after PO.

Vermilion-Energy